Net Zero Analysis and HPE OEM Team UP!

Here is a press release on our New Partnership   Net Zero Analysis and HPE OEM Partnership

Net Zero Analysis & Design Corp. Becomes a Carbon Credit Aggregator

We are in the process of becoming a Carbon Credit Aggregator in the US, with concurrent certification in Asia and the EU. This gives us the advantage to leveraging the energy savings for all of our clients that have our…

Net Zero Analysis & Design Corp. Becomes a Carbon Credit Aggregator

We are in the process of becoming a Carbon Credit Aggregator in the US, with concurrent certification in Asia and the EU. This gives us the advantage to leveraging the energy savings for all of our clients that have our…

Air Sealing the foundation is completed

Air Sealing the foundation is completed

Air sealing the interior and exterior foundation

Air sealing the interior and exterior foundation

We are using a 2 pound Dow Blue Foam for the air sealing

Air sealing the interior and exterior foundation

Air sealing the interior and exterior foundation

Foundation design is cast concrete exterior walls, insulation layer and interior block foundation. The insulation layer is air sealed to the exterior and interior foundations for the main building, root cellar, and garage.

Interior Foundation Structural

Interior Foundation Structural

Interior Foundation has epoxy coated rebar every 24 inches that is tied to the thermally broken mat slab foundation and runs up to the top bond beam. The 24 inch on center CMU cells are grouted solid to the bottom of the bond beam

North Wall of Interior Foundation

North Wall of Interior Foundation

Interior Foundation is finished in the main building and the attached root cellar

Interior Foundation is finished in the main building and the attached root cellar

Interior foundation is the forground and root cellar is in background

Structural columns are brought up to Grade

Structural columns are brought up to Grade

Structural columns are stepped back as they are brought up to grade for the stone planter foundations, and grouted solid with an epoxy coated rebar in each CMU cell