Blog

Building Science Institute is the QAD, DOE Challenge Home Verifier, and Certified RESNET Rater for Full Revolution Farm

Eco Smart Building LLC is the Designer, Builder, and Construction Administrator for Full Revolution Farm. We selected Building Science Institute as our third party for Quality Assurance Designee and Testing Agent for; US DOE Challenge Home Program, US EPA Energy…

Full Revolution Farm is prepared for Pressurization and Depressurization Testing to 75 Pascal’s

During the Pressure and Depressurization Testing Thermal Imaging will be done on all SIP Joints and Intersections as well as the connection of the SIP’s to the Continuous Below Grade Dow Blue Board Insulation Layer between the 2 structural foundations…

Portioco is Framed and Sheathe

Roof Eves are Framed around the Installed SIP Roofs

Third Floor North SIP Roof is Installed from the South Side

Southeast Gable, South, and Third Floor North Wall Roof SIP Intersection is Prepaired for SIP Roof Inatall

South and Southwest Gable SIP Roofs are Installed

View looking South at North Roof SIP Roof Install

View of Northwest, and North Gable SIP Roof Install

Northwest Gable Sip Roof Install Viewed From the Inside