Building Footings and Structural Column Pads are ready to Pour Concrete

Building Footings and Structural Colum Pads are ready to Pour Concrete

Hydrostatic Mat is installed before the insulation of all Structural Column Pads

Hydrostatic Mat is installed becore the insulation of all Structural Colum Pads

Summer and Main Kitchen, Floor Drain serving the Root Celler and Conservatory is Installed

Summer and Main Kitchen, Floor Drain serving the Root Celler and Conservatory is Installed

Insulated Water Lines are Installed Serving Root Cellar, Conservatory, Yard Hydrants, and the Barn

Insulated Water Lines are Installed Serving Root Cellar, Conservatory, Yard Hydrants, and the Barn

Second Ramp is Cut-in Allowing Access to South Building Excavation

Second Ramp is Cut-in Allowing Access to South Building Excavation

Root Cellar and Conservatory Footings Will be Installed in the First Ramp Space