Full Revolution Farm Building Footing Pour Starts

Full Revolution Farm Building Footing Pour Starts

Concrete Delivery is now scheduled at two trucks every 10 mim

Full Revolution Farm Step Footings are Bull Floated Flat

Full Revolution Farm Step Footings are Bull Floated Flat

Full Revolution Farm Empty Concrete Trucks Pull away from the Pumping Truck

Full Revolution Farm Empty Concrete Trucks Pull away from the Pumping Truck

Concrete Trucks once empty go to the wash out pit for cleaning before they return to the plant for the next load of concrete.

Full Revolution Farm First Pair of Concrete Trucks load the Pumping Truck

Full Revolution Farm First Pair of Concrete Trucks load the Pumping Truck

Two Concrete Trucks are set to deliver every 15 to 20 minutes at the site to ensure a consistent pour with no cold joints in the footings.

Full Revolution Farm Final Footing Walkthrough is Completed

Full Revolution Farm Final Footing Walkthrough is Completed

The pumping truck is setting up, and primed with the first concrete delivery as the final footing walkthrough is completed. Third Party Footing Inspection by the geotechnical company is also completed at this point. They will also sample the concrete as the trucks are delivering.

Full Revolution Farm First Concrete Truck has arrived to Prime the Pumping Truck

Full Revolution Farm First Concrete Truck has arrived to Prime the Pumping Truck

Full Revolution Farm Pumping Truck Setting up for Footing Pour

Full Revolution Farm Pumping Truck Setting up for Footing Pour

The footing pour is 147 yards of 4,000 psi concrete

Site is Cleaned and Staged for Concrete Trucks Delivering to the Concrete Pumping Truck

 Sight is Cleaned and Staged for Concrete Trucks Delivering to the Concrete Pumping Truck