View of installed Garage West Wall and Start of Building North Wall install

Garage Northwest Corner is Set

Garage North Wall

Garage Northeast Corner is the first panel that is set to start the East Wall of the Building and the North Wall of the Garage. First photo is an interior view of the Garage looking at the Northeast Corner and…

First of 3 Panels are set on the south side of the building 3

Installed Panels on Southwest, West, and Northwest sides of the Building

First of 3 Panels are set on the south side of the building 2

First of 3 Panels are set on the south side of the building 1

First Outside Corner is Bedded and Set

Thermal Bridge Free Wall Panels are Staged

Full Revolution Farm Thermal Bridge Free Construction

Out Thermal Bridge Free Construction Wraps all six sides of the project; 1 foot thick Dow Blue board under our matt slab and footings and between the double foundation walls which is air sealed to the foundation walls 1 foot…

Full Revolution Farm Viewed from the Southwest