Blog

Garage Sip Panels are Installed Top View

All Garage SIP’s are installed, the connections are all foam to foam, and there are no thermal bridges between the attached garage and the conditioned building space. SIP’s run through the 18 inch wood webs of the garage ceiling to…

Second Garage Sip Panel is Slid into Place

First Garage Sip Panel is Bedded

First Garage SIP Panel Bedding is Prepared for the Foam to Foam Connection

The First SIP Panel is attached to the exterior SIP on the East Wall and the Below Grade Dow Blue Board

Soutwest Outside Corner is Installed

Northwest Inside Corner in Entry Foyer Wall Install is finished

inside-conor.jpg

South Wall SIPs are Installed

Installed SIP Panels

North Garage Wall West Garage Wall North Building Walls North Entry Foyer West Building Wall West Entry Foyer Wall Install is underway

View of North and West Walls as Panels are set