Mat Foundation Rebar is supported on 1.5 inch highchairs. Sonotubes are installed around the structural column locations, and the foundation is ready for the hydronic system piping.
Mat Foundation Rebar is supported on 1.5 inch highchairs. Sonotubes are installed around the structural column locations, and the foundation is ready for the hydronic system piping.