Footing Drains are excavated on both sides of the 18 inch footings for positive pitch to the east side of the building. The excavation is then lined with a filter fabric, 6 inches of C7 clean is then installed and checked for positive pitch, a 5 inch socked drain tile is then installed and surrounded with clean C7 and the filter fabric is then wrapped around the gravel and covered with C7 to hold it in place.

Full Revolution Farm Garage Earth Tube Exhaust is installed through the garage wall pour << >>Full Revolution Farm Footing Drainage System is installed on both interior and exterior sides of the footings

About the author : Net Zero Analysis & Design Corp.

Principal and CEO of Net Zero Analysis & Design Corp Passive House Consultant Energy Star Partner RESNET Quality Assurance Provider Building America Partner US DOE Zero Energy Ready Home Partner Member of the Board of Directors for BSI

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.